Pittville School Sports Hall

Project:
Pittville School, New build Sports Hall
 
Client:
Barnwood Ltd
 
Project Role:
Building Services Design
 
Working with:
Gloucestershire County County, Barnwood 
 
Photo Credit: Barnwood

Working on behalf of the main contractor, we have delivered technical design proposals for a new-build Sports Hall facility for Gloucestershire County Council to the south of the existing Pittville School site. Designed to serve both the school and wider community, the development comprises of a four-court Sport England-compliant hall, floodlit 3G pitch, changing facilities, staff areas, and a first-floor fitness suite and dance studio.

The school will remain operational throughout construction, requiring sensitive phasing and strict adherence to Contract Administrator approvals.

The building services strategy prioritises low-carbon design and operational efficiency. Space heating will be delivered via radiant panels served by an air source heat pump located in the external compound above the plantroom, with ancillary areas heated via radiators. Ventilation to the Sports Hall will be provided by roof-mounted windcatchers incorporating heat recovery. Domestic hot water will be generated via a dedicated ASHP and stored in indirect cylinders within the plantroom.

Lighting will be provided by intelligent LED systems with localised presence/absence detection and retractive switching in office areas. Scene-setting plates will enable flexible lighting levels within the hall to suit varied sporting disciplines.

The energy strategy targets full offset of regulated energy use in accordance with Part L2A BRUKL methodology, achieved via roof-mounted PV arrays. The building is designed to achieve an EPC A+ rating.

Our duties to date span RIBA Stages 2 – 4 on a full design basis, with a contract value of £5.2m. Stage 2–3 works included site surveys, development of the MEP servicing strategy, thermal modelling, utility applications, and production of a sustainability report and external lighting impact assessment to support planning. Stage 4 deliverables included coordinated tender documentation—specifications, drawings, schedules, and design risk assessments. All design outputs were produced and co-ordinated within 3D Revit environments.

This project reflects our continued commitment to delivering resilient and energy-efficient systems for education and community use, with a focus on compliance, stakeholder engagement, and long-term value.